Southeast Power Link

See how new infrastructure will enhance electric system reliability and enable community growth in the Southeast Valley.

See how new infrastructure will enhance electric system reliability and enable community growth in the Southeast Valley. To contact SRP about this project, please call (602) 236-2872.

Southeast Power Link CEC

On Aug. 1, 2018, SRP filed an application for a Certificate of Environmental Compatibility (CEC) with the Arizona Corporation Commission (ACC). All documents filed with the ACC related to the Southeast Power Link project are available on the ACC eDocket website .

Final CEC approval

On Nov. 7, 2018, the ACC unanimously approved the CEC for the project. The approval is the final step of the application process and enables SRP to move forward with land acquisition, project design and construction. Read press release Document is a PDF

Download the CEC

  1. Introduction Document is a PDF
  2. CEC application Document is a PDF
    1. Supplement to application for CEC Document is a PDF
    2. Revised route map Document is a PDF
  3. Exhibit A: Project Location and Land Use Document is a PDF
  4. Exhibit B: Environmental Studies Document is a PDF
  5. Exhibit B-1: Aeronautical Impact Statement Document is a PDF
  6. Exhibit C: Areas of Biological Wealth Document is a PDF
  7. Exhibit D: Biological Resources Document is a PDF
  8. Exhibit E: Scenic Areas, Historic Sites and Structures, Archaeological Sites Document is a PDF
  9. Exhibit F: Recreational Purposes and Aspects Document is a PDF
  10. Exhibit G: Concepts of Typical Facilities Document is a PDF
  11. Exhibit H: Existing Plans Document is a PDF
  12. Exhibit I: Noise Emissions and Communication Interference Document is a PDF
  13. Exhibit J: Special Factors Document is a PDF

Additional documents filed with the ACC relating to SRP's application: