Project Red Hawk CEC filing

On Sept. 23, 2019, SRP filed an application for a Certificate of Environmental Compatibility (CEC) with the Arizona Corporation Commission (ACC). All documents filed with the ACC related to Project Red Hawk are available on the ACC eDocket website .

CEC approval

Project Red Hawk was heard before the Arizona Power Plant and Line Siting Committee and received a recommendation to approve the CEC on a 7-1 vote. The switchyard has been required to be constructed with the area SRP had defined and proposed at the northern portion of the project site; however, the switchyard will be constructed as far south as practical within the designated location. The Committee required a 10 foot wall be constructed on the North and East side of the switchyard to mitigate the visual impact of the switchyard.

On Dec. 10, 2019, the ACC unanimously approved the CEC for the project. The approval is the final step of the application process and enables SRP to move forward with project design and construction. ACC Decision No. 77551: CEC Approval Document is a PDF

Transcripts

Download the CEC

  1. Introduction Document is a PDF
  2. CEC application Document is a PDF
  3. Exhibit A: Project Location and Land Use Document is a PDF
  4. Exhibit B: Environmental Studies Document is a PDF
  5. Exhibit C: Areas of Biological Wealth Document is a PDF
  6. Exhibit D: Biological Resources Document is a PDF
  7. Exhibit E: Scenic Areas, Historic Sites and Structures, Archaeological Sites Document is a PDF
  8. Exhibit F: Recreational Purposes and Aspects Document is a PDF
  9. Exhibit G: Concepts of Typical Facilities Document is a PDF
  10. Exhibit H: Existing Plans Document is a PDF
  11. Exhibit I: Noise Emissions and Communication Interference Document is a PDF
  12. Exhibit J: Special Factors Document is a PDF

Additional documents filed with the ACC relating to SRP's application